Leeds Liverpool CanalOther CanalsAboutCanalsLinks and Books
  Pier Head Tunnel   
previous Canal Section page    L&L canal home page next
 

The metal work for the walls is ready next the concrete will be poured.

Google
 
 
Copyright | About the Site | About Me | Contact