St Nicholas Place | ||||
previous | Canal Section page | L&L canal home page | next | |
The tunnel under the road at St Nicholas Place was the first part of the dock link to be built. The tunnel was initially only built up to the metal piling. This section was then filled in and covered over.
|
||||